Roofing Company Serving Eustis, FL
DeSantis Roofing Inc. provides roof inspections, repairs, replacement and commercial roofing for Eustis property owners. If your request involves a material change on a designated property, bring that into the discussion early. The roof’s condition, proposed appearance and specified product each need a clear description before you commit to the work.
Request a Roof Inspection · Call 321-501-6220
DeSantis holds Florida roofing license CCC1334390 and handles Eustis requests through its Apopka office. You can request help with a leak before deciding whether a new material is appropriate.
A published Eustis case shows why “metal is banned” is too broad
The City’s March 8, 2023 Historic Preservation Board minutes record approval in case 2023-COA-04 for a reroof changing asphalt shingles to metal. That is a documented case decision, not an approval for another property or a rule permitting every metal profile. It is not a DeSantis project.
The associated March 2023 meeting packet describes a mixed scope: most roof areas proposed for standing-seam metal, a small rear section remaining shingle, and the front porch excluded because it had been replaced earlier. The application also described siding work connected with new flashing.
For your proposal, the useful lesson is to identify retained areas and related exterior work. “Change to metal” alone may leave the reviewer and contractor picturing different projects.
Confirm the designation, then describe the whole exterior change
Eustis’s Certificate of Appropriateness application identifies local landmarks/sites, the Eustis Main Street Area and Washington Avenue Historic District. Ask Development Services which designation and review apply to your address.
The form asks for the entire proposed exterior scope, where work occurs, how it will be accomplished and the materials. Photos, drawings, samples and product brochures may support that description. Include any associated siding, flashing or roof-shape change rather than submitting only a color preference. The application categories themselves do not determine that every repair needs a board hearing.
Compare three proposals that may sound similar
| Proposed work | What needs to be explicit |
|---|---|
| Repair the existing covering | The affected area, what will remain and any visible change. |
| Replace the covering with a similar product | The actual replacement product and whether any adjoining details change. |
| Change the roofing material | Each included roof area, retained sections and associated exterior alterations. |
Use the same area descriptions when speaking with the roofer and reviewer. If you are retaining a porch roof, say so in both conversations. If new flashing affects adjacent siding, ask whether restoration is included in the estimate and described in the proposed work. These details help prevent a price comparison between different scopes.
Product documentation still has its own purpose
The City’s product approval form records product type, approval number, manufacturer and description. Those fields identify the construction product; they do not replace an appearance decision for a designated building.
Ask the estimate to identify the product actually proposed. If it becomes unavailable, request the substitute’s information and a revised scope before accepting it. Confirm which submissions need updating so the material ordered agrees with the work authorized. Similar color is not a complete product comparison.
Questions about repair and material changes
Does that 2023 decision mean my metal roof will be approved?
No. It provides a specific published example, not transferable permission. Ask the City to review the proposal for your property and keep any conditions with the final selection.
What if I need leak help before the material review is resolved?
Request an assessment and identify the pending review. Ask what work addresses the present concern and what belongs to a future replacement. Clarify the applicable authorization for any proposed work rather than assume the assessment itself settles it.
What should I bring when part of the roof will remain?
Explain which sections you intend to retain and provide available photos or prior work records. Ask the roofer to identify the connection between old and new work. Keep those boundaries in the written proposal so the retained roof does not disappear from the discussion.
Contact DeSantis with the Eustis address and the roof concern, along with any City correspondence or material proposal already available.