During tear-off at this Winter Park home, DeSantis Roofing found a sheet-metal patch over an opening in the roof deck. The opening needed a wood repair before the new roofing could go on.
DeSantis removed the patch and repaired the opening with dimensional lumber. After completing the deck work, DeSantis installed the Owens Corning Duration shingle roof.
Owens Corning Duration Roof Replacement in Maitland
Roof and Gutter Replacement in Ocoee
GAF TPO Roof Replacement in SoDo, Orlando
Roof and Gutter Replacement in Alafaya
CertainTeed Flintlastic Flat Roof Replacement in Windermere
Storm-Damaged Roof Replacement in Winter Haven
Storm-Damaged Roof Replacement in Rock Springs Ridge
Commercial Modified Bitumen Roof for New Construction in Ormond Beach